Installing "New Windows Process"-What to Expect
Top 10 Air Leaks in Your Home
10 Points Differentiate Us
Real World 50% Energy Savings
Credit Card - make payments here

Explaining the process of installing New Windows:
 
1-Owner enters agreement with us for New  Windows
2-Financial terms worked out(down payments,final payment)
3-Windows are measured  by technician for proper fit(15 minutes)
4-Usually takes only 2 weeks for custom built windoows to be factory built(special orders 4 weeks)
5-Homeowner notified when we receive their factory-ordered windows
6-arrange date with customer for installation
7-Windows installed 1-2 days
  • no special prep is needed by homeowner, but draperies taken down ahead of time ,is appreciated
  • One Room at a time, Windows are installed
  • No Window is left open more than 10 minutes usually
  • Clean up in each room is done progressively
  • One or two Technicians will be inside the home, one Technician outside
  • Last step inside to process is sealing,caulking inside,and all final clean up of carpets, floors
  • Outside is sealed, and or Frames capped
  • Each Window receives final inspection
  • Warranty is reviewed with customer
  • Window operation is taught to customer
  • Final payment is made at conclusion

What if we find rot or termite issues when removing old windows ?

  • Any undiscovered problems will be pointed out to homeowner
  • Cost estimates for repairs will be given
  • Work will be done immediatey to correct
  • Work then continues on same day as scheduled

Occasionally, we find termite damage, or a rotted piece of old wood, and in turn requires fixing. But we only find such issues in 1 out of 15-20 homes. Even then the homeowner is usually aware of a relatively easy fix with new wood  piece replaced.Major structural issues normally do not accompany a window replacement project. Remember it is relatively inexpensive to replace a piece of wood($25 or so).

 

A typical Window Project of 20 Windows is normally completed in two days. About 95% of our Window Projects are 1.5 working days.

Can your existing trim/woodwork be used ?

Yes, in most homes we re-use the existing trim boards inside, around the window. Outside, the window trim is usually "Capped" to eliminate painting(capped in custom fit Coated Aluminum of your color choice)

img00004-20101104-1536.jpg

wdlogonew.jpg

wdlogonew.jpg

COLUMBUS,MARION,KENTON,GALION,DELAWARE, BUCYRUS ,LEWIS CENTER,SUNBURY,WESTERVILLE,JOHNSTOWN,POWELL,LEWIS CENTER,MARENGO,MT.GILEAD,EDISON,MT.VICTORY,MARYSVILLE,HILLIARD,DUBLIN,GALENA,ADA,SYCAMORE,TIFFIN,NEVADA,UPPER SANDUSKY,FREDRICKTOWN,TIRO,URBANA,MT. VERNON